Local Municipality Utility and Concrete Project
Humbolt Elementary Field

Scope of Work
Whelcon Contractors was hired by the Humboldt Unified School District to assist in completing the school’s field irrigation, field retention, and overall improvements. While constructing their new water system, Whelcon also installed concrete pathways to assist with water redirection.
Key Project Elements
- Storm Drain Installation
- Head Wall and Concrete Channel Implementation
- 20′ x 20′ Concrete Pad Installation
- Rip Rap Repair
- Miscellaneous Playground Equipment Relocation and Repairs
- Seating Areas and Shade Structures Installed
Project Location:
Tucson, Arizona
Project Owner:
Humboldt Unified School District
Project Timeline:
April 2019 – June 2019
Contract Amount:
$ 399,480.00